JINAN TRUCKMAN AUTOMOBILE CO.,LTD

WhatsApp: +86 156 6573 6726
  • Heavy Duty Dump Truck
  • Prime Mover Truck
Contact Us

TRUCKMAN International Sales Center

WhatsApp: +86 18615693883

 

SALES DEPARTMENT 1

Contact Person: Eric GAO

WhatsApp: +86 15665736726

E-mail: eric@truckmanauto.com

 

Contact Person: Angela WANG

WhatsApp: +86 19153136362

E-mail: angela@truckmanauto.com

 

Contact Person: Luna LIU

WhatsApp: +86 19153138337

E-mail: luna@truckmanauto.com

 

SALES DEPARTMENT 2

Contact Person: Tyne GUO

WhatsApp: +86 15330633674

E-mail: tyne@truckmanauto.com

 

Contact Person: Scott YANG

WhatsApp: +86 17615404503

E-mail: scott@truckmanauto.com

Company News

XCMG LW500FN 5 Ton Wheel Loader To Algeria

2024/07/10

The customer in Algeria found us through a friend's recommendation and inquired about the price of the loader. After communicating with the customer, we understood that the customer used it for harbor construction. Therefore, we recommended the XCMG LW500FN 5 Ton Wheel Loader to the customer, the loader is very popular in the local market, the customer also very much like the configuration of this construction machinery, the customer wants to use it as soon as possible, and immediately paid the deposit, and now our factory has begun production.

 

 

The XCMG LW500FN wheel loader's electrical system, hydraulic system, structural parts, cab and hood are fully optimized and upgraded, with reliability, working capacity, operating comfort and easy maintenance significantly improved. The rear frame adopts high-strength steel plate box-type welding structure, which improves the bearing capacity unprecedentedly. The bucket adopts high-strength steel plate, more than doubling the service life. Imported wiring harness and layout technology, with imported waterproof and dustproof connectors, beautiful and reliable performance.

 

 

The XCMG wheel loader adopts energy-saving and reliable hydraulic system, adopts double-pump split-combined flow technology, the steering pump is preferentially supplied to the steering system, and when it is not steering, the flow of the steering pump all flows into the working hydraulic system, which reduces the displacement of the working pump, and improves the reliability of the hydraulic components and reduces the heat generation of the hydraulic system, realizing energy saving.

 

 

Regarding the standardized use of the loader: the loader just after starting, the diesel engine just after starting, the machine temperature is low, diesel fuel combustion is incomplete, should be run at low speed for 3 to 5 minutes, the purpose is to let all parts of the body slowly and evenly warmed up to reach the normal working temperature, reduce wear and tear, to avoid mechanical strains. After warming up the machine, make the lubricating oil reach each lubricating part gradually to avoid dry friction and damage to the cooperating surface.